Sprint Cadence

The ASDD sprint cadence adapts agile rhythms to account for both human and agent work streams running simultaneously. The key difference from traditional Scrum: agents execute continuously during the sprint while humans orchestrate, review, and resolve escalations.

Recommended cadence: 2-week sprints.


Sprint structure

DayActivityWho
Day 1 (Mon)Sprint PlanningPO + TL + Engineers
Days 1–9ExecutionAgents + Engineers
Day 5 (Fri)Mid-sprint syncTL + Engineers
Day 9 (Thu)Sprint ReviewPO + TL + Stakeholders
Day 10 (Fri)RetrospectiveTL + Engineers

Sprint ceremonies in detail

Sprint Planning (Day 1)

Duration: 2–3 hours

Agenda:

  1. PO presents approved specs (all must have passed the Spec Validation Gate)
  2. TL confirms all specs in the sprint are sprint-ready (see criteria below)
  3. Team selects work for the sprint — only from sprint-ready specs
  4. Agent task queues are configured: WIP limits set, slice priorities assigned
  5. Knowledge Agent briefed: relevant domain context injected for the sprint

What happens if a spec is not sprint-ready? It does not enter the sprint. No exceptions. The TL escalates to the PO for spec remediation before the next sprint.


Execution (Days 1–9)

Human activities:

  • Orchestrate agents: configure inputs, review outputs
  • File Dissent Notices when agent output is unsafe or non-compliant
  • Resolve agent escalations routed by the Knowledge Agent
  • Review Self-Healing PR proposals

Agent activities:

  • Execute implementation waves in parallel
  • Emit confidence scores for all outputs
  • Escalate to Knowledge Agent when blocked
  • Update State Manifest at each state transition

The key operational rhythm: Engineers start each day by checking the State Manifest for pipeline halts and escalations. Unresolved halts from the previous day are the first priority — they block downstream agents from executing.


Mid-Sprint Sync (Day 5)

Duration: 30–45 minutes

Agenda:

  1. TL reviews agent confidence log from Days 1–4
  2. Any pipeline halts are resolved or escalated to PO
  3. Spec drift check: does any implementation diverge from the approved spec?
  4. WIP limit review: any agent queues at capacity?

The mid-sprint sync is a quality gate, not a status meeting. If confidence scores are trending down or override frequency is up, the team adjusts — not at the retrospective, but now.


Sprint Review (Day 9)

Duration: 1–2 hours

The ASDD sprint review demonstrates spec compliance, not features. Demo items are evaluated against the acceptance criteria in requirements.md, not against stakeholder impressions.

Agenda:

  1. For each completed spec: demonstrate the behavior against the spec acceptance criteria
  2. PO accepts or rejects outcomes based on spec compliance
  3. Any rejected outcomes are logged and returned to the backlog with a dissent reason
  4. Agent failure log reviewed at a high level with stakeholders (transparency)

Retrospective (Day 10)

Duration: 1 hour

Inputs reviewed:

  • dissent-log.md — What was rejected? What patterns emerged?
  • agent-failure-log.md — What failed? How quickly was it resolved?
  • Override frequency by agent — Are specific agents failing repeatedly?
  • Spec Validation Gate failure rate — Too many specs blocked at validation = upstream problem

Learnings are fed to the Knowledge Agent. The TL summarizes actionable patterns in docs/lessons-learned.md. The Knowledge Agent incorporates these for future analysis.


Agent WIP limits

To prevent agent queues from growing unbounded, each agent has a defined WIP limit. Tasks exceeding these limits are queued and not started until an in-progress task completes.

AgentMax Concurrent Tasks
Spec Agent5 requirements
Design Agent1 architecture per squad
Implementation Agent3 features
QA Agent10 test suites
Security Agent1 full scan per deployment

Why WIP limits matter for agents: Unlike humans, agents do not naturally self-limit. Without WIP constraints, an Implementation Agent will accept 20 simultaneous tasks and produce degraded output on all of them. WIP limits are a quality control mechanism.


Spec readiness definition

A spec is sprint-ready when all of the following are true:

CriterionVerified by
Spec Validation Gate passed (Phase 1 exit)Validation Agent + TL
Domain model contains all referenced entities (Phase 2 complete)Domain Agent + CI
Architecture design references the spec (Phase 3 exit)Design Agent + TL
No open dissent notices against the specDissent Log
TL has signed offTL (manual)

No spec-unready work enters a sprint under any circumstances.

This is the rule that causes the most initial friction and produces the most long-term efficiency. Teams that enforce it rigorously see Spec-to-Ship Time drop significantly after the first 3 sprints.


The "ASDD Quick Mode" shortcut

For trivial tasks — UI label changes, simple bug fixes, documentation updates — ASDD provides a Fast-Track Flow that bypasses the full ceremony while maintaining traceability.

/asdd:quick "Fix typo in login header"
  1. User provides a one-line intent
  2. Implementation Agent generates the fix immediately
  3. QA Agent verifies against the codebase
  4. Knowledge Agent logs the activity as a QUICK_FIX slice in manifest.json

Quick Mode preserves auditability without Phase Gate overhead. It is only appropriate for changes that are definitionally trivial — if there is any architectural impact, it does not qualify.


Common sprint anti-patterns

Anti-patternSymptomCorrection
"We'll fix the spec later"Requirements are marked sprint-ready without passing the Validation GateTL enforces the gate; no gate = no sprint entry
Unlimited agent parallelismAgent output quality degrades across all concurrent tasksEnforce WIP limits; prioritize slices
Ignoring pipeline haltsEscalations sit unresolved for daysTL makes pipeline halt resolution a daily first priority
Retrospective without dataDiscussion is anecdotal, not pattern-basedMandatory review of dissent log, failure log, and confidence trends
Quick Mode overuseQuick Mode used for any task requiring a specTL audits Quick Mode usage; patterns > 5 per sprint warrant review